e911 Test Plan Procedures
- At switch under test; make all trunks busy to Telco Tandem switches.
- Initiate 9-1-1-test call from each NNX test number.
- Verify proper all trunks bust indication (120 IPM).
- Un-Busy trunk #1 to the “Primary Route” Telco Tandem switch.
- Initiate 9-1-1 test call from each NNX test number, associated with the PSAP (See test number list).
- Verify correct ALI/ANI information with the 9-1-1 PSAP calltaker.
- Disconnect the test call.
- Make the trunk just tested busy and un-busy the next trunk in the primary route trunk group.
- Repeat steps 5 through 8 progressing through all trunks in the primary route trunk group correcting/document ting any problems encountered.
- Un-Busy trunk #1 to the “secondary route” Telco Tandem switch.
- Repeat steps 5 through 9 progressing through all trunks in the secondary route trunk group.